Timaru Substation Development

Within the next few years, Timaru area load will start to exceed the firm capacity of the Timaru interconnecting transformers during times of peak demand. Transpower will then need to either manage demand through non transmission solutions or implement a transmission solution.

Documents

Timaru substation development - Process and Consultation Timetable

20/03/2012 (1 documents)

Timaru Substation Development 19 March 2012 PDF (16 KB)