Showing 921
to 930
of 973 results
-
13 Apr 2017 -
CENTRAL PARK – WILTON B CONDUCTOR RELACEMENT. Attachment A. CONDITION ASSESSMENT. Central Park – Wilton B Conductor Replacement – Condition Assessment Transpower New Zealand Ltd 2013 Page 2 of 14. 1| Executive Summary. The Central Park –
-
13 Apr 2017 -
options and costing report Transpower New Zealand Limited 2007. All rights reserved. i. CENTRAL PARK – WILTON B RECONDUCTORING Attachment B. OPTIONS AND COSTING REPORT. Transpower New Zealand Limited. [Report Date]. Error! No text of specified
-
13 Apr 2017 -
TO: Matt Fanning FROM: Cham Herath / Sol Friedman DATE: 22nd January 2016. TRANSPOWER WIL-CPK B LINE RE-CONDUCTORING SUBMISSION Transpower has indicated the need to replace the conductor on the CPK-WIL B line due to condition by 2018. A long list
-
13 Apr 2017 -
TRANS POWER Transpower House 96 The Terrace PO Box 1021 Wellington 6140 New Zealand. P 64 4 495 7000 F 64 4 495 7100. www.transpower.co.nz. Keeping the energy flowing. Jeff Edhouse Tel:04 4957042 Fax:04 495 7184 DX:SR 56023. 15 September 2016. Sol
-
13 Apr 2017 -
31 January 2017 v.v. Awellington electricity. Wellington Electricity. Lines Limited. Jeff Edhouse 75 The Esplanade Petone, PO Box 310A9. Lower Hutt 500. New Zealand. Transpower New Zealand Ltd PO Box 1021 WELLINGTON. Tel:6 915 6100. Fax:5Vi 915
-
13 Apr 2017 -
To Jeff Edhouse (Jeff.Edhouse@transpower.co.nz). From Geoffry Sams, Transmission and Markets Specialist. Date 31st January 2017. Subject CPK_WIL_B Reconductoring – Meridian Submission. Question 1: Is our proposal reasonable? Question 3: Is our
-
13 Apr 2017 -
Financial year ending June. Total 2016 2017 2018 2019 2020. Real costs (P50 values). Investigation 550,000 275,000 275,000 - - -. Design & prep work 1,399,201 - - 932,801 466,400 -. Construction - labour 5,176,063 - - - 5,176,063 -. Construction …
-
13 Apr 2017 -
Attachment H. TRANSPOWER NEW ZEALAND LIMITED. Minutes of a Meeting of the Board of Directors, Transpower New Zealand Limited, held at the Transpower Wellington Offices, 96 The Terrace, Wellington. on Thursday 23 February 2017 at 8.30 am. 11 Central
-
12 Apr 2017 -
2827433.5. ISBN 978-1-869455-72-9 Project no. 15.01/14119. Public version. [Revised draft] Gas Transmission Services Default Price-Quality Path Determination 2017. The Commission: Energy Division Sue Begg. Dr Mark Berry Dr Stephen Gale Dr Jill Walker
-
11 Apr 2017 -
2850728. ISBN no. 978-1-869455-64-4. Project no. 14.20/16104. Public version. Input methodologies review. Related party transactions – Invitation to contribute to problem definition. Date of publication: 12 April 2017. 2850728. Associated