Showing 11
to 20
of 56 results
-
26 Jun 2024 -
NOTE – PRODUCTIVITY CODE DESCRIPTION. This note describes the code used to estimate the numbers shown in our report on the productivity of EDBs. The. code is contained in a series of R scripts. The figure below shows a model map of these various R
-
27 Jun 2024 -
Telecommunications Development LevyImportant information for QLPs. The Telecommunications Development Levy (TDL) is an annual levy which is used to pay for telecommunications infrastructure and services including the relay service, broadband for
-
2 Jul 2024 -
26 June 2024. Matthew Clark Manager, Transpower and Gas Commerce Commission PO Box 2351 WELLINGTON 6140. Sent via email: infrastructure.regulation@comcom.govt.nz. Dear Matthew. 1. This is a submission from the Major Electricity Users’ Group (MEUG)
-
1 Jul 2024 -
5165313-1. ISBN no. 978-1-991287-46-5. Project no. 11.03/PRJ0047023. Public version Draft Determination Payments NZ Limited The Commission: Dr John Small. Anne Callinan Bryan Chapple. Summary of application: Payments NZ Limited has applied for
-
2 Jul 2024 -
5163872. ISBN 978-1-991287-29-8 Project no. 46062. Public version. [Draft] Transpower Individual Price-Quality Path Determination 2025. [2024] NZCC XX. The Commission: Vhari McWha Dr Derek Johnston. Bryan Chapple Nathan Strong. Date of decision: [day
-
26 Jun 2024 -
3950406.1. ISBN 978-1-991287-44-1. Project no. PRJ0046469. Public Version. Commission 111 Contact Code 2024. This version of the Code is the Commission 111 Contact Code as amended by the Commission 111 Contact Code (Amendment Version 2024). The
-
26 Jun 2024 -
EDB Productivity Study 2024. The productivity of Electricity Distribution Businesses (EDBs), measured as their outputs relative to inputs, is an important performance indicator. Over time, we and other stakeholders expect EDB productivity to
-
2 Jul 2024 -
Meridian Energy Limited 293-297 Durham St North Phone 8088 496 496 P O Box 2128 Christchurch www.meridianenergy.co.nz Christchurch New Zealand. 26 June 2024. Commerce Commission By email: infrastructure.regulation@comcom.govt.nz. Transpower’s
-
2 Jul 2024 -
Waikoukou 22 Boulcott Street PO Box 1021 Wellington 6140 New Zealand. P 64 4 495 7000 F 64 4 495 6968 www.transpower.co.nz. Manager, Transpower and Gas. c/o infrastructure.regulation@comcom.govt.nz. 26 June 2024. Transpower Individual Price-Quality
-
25 Jun 2024 -
Prepared for the Commerce Commission | June 2024 1. Cisco Confidential. Report 20, June 2024. The Measuring Broadband New Zealand programme measures the quality of New Zealand’s fixed. line, fixed wireless, and satellite internet. The aim of the