Showing 191
to 200
of 313 results
-
21 Nov 2012 -
Wash up Calculations. PSE1 BB Model. Closing 2012 Value per PSE2 BB Model. Open. Reval. Closing. PSE2. Less Capex. PSE2 2012. 2006. 2007. 2012. 2012. 2012. 2012. Deprec in 2012. Revals Only. Land. 129,116. 133,163. 149,735. 146,083. 146,083.
-
8 Oct 2012 -
Otahuhu Substation Diversity Project Transpower New Zealand Limited 2007. All rights reserved. i. OTAHUHU SUBSTATION DIVERSITY PROJECT. APPLICATION FOR INCREASE OF MAJOR CAPEX ALLOWANCE. Transpower New Zealand Limited. September 2012. Otahuhu
-
24 Dec 2012 -
GDB Information Disclosure Requirements. Information Templates. for. Schedules 11–13. Company Name. Disclosure Date. AMP Planning Period Start Date (first day). Templates for Schedules 11a–13 (Asset Management Plan). Template Version 2.0.
-
24 Dec 2012 -
GTB Information Disclosure Requirements. Information Templates. for. Schedules 11–13. Company Name. Disclosure Date. AMP Planning Period Start Date (first day). Templates for Schedules 11a–13 (Asset Management Plan). Template Version 2.0.
-
-
18 Dec 2012 -
BARNZ Cross-submission to s56G Draft Report Submissions Page 1. BARNZ CROSS-SUBMISSION ON WELLINGTON AIRPORT DRAFT REPORT SUBMISSIONS. 12 December 2012. The submissions by NZ Airports, Wellington, Christchurch and Auckland Airports all make.
-
29 Oct 2012 -
Directors: Dougal Smith Dip Hort, B.Com (VPM), MNZPI. Paul Mills B.Com (VFM), Dip Grad Com, MNZPI. David Oxnam B.Com Ag (VFM), ANZPI. Associates: Tom Marks Dip VFM, B (Ag) Com, FNZIV, MNZIPIM. Rebecca Turley B.Com Ag (VFM), MNZPI. Nick Cottam B.Com
-
3 Dec 2012 -
NZ Airports Association Submission on WIAL Draft Report, 30 November 2012 Page 1. SUBMISSION ON THE COMMERCE COMMISSION DRAFT REPORT ON THE. SECTION 56G REVIEW OF WELLINGTON AIRPORT. 30 NOVEMBER 2012. 1. The New Zealand Airports Association ("NZ
-
10 Dec 2012 -
1441975_2. Decision No. NZCC 22. Electricity Distribution Information Disclosure Determination 2012. Electricity Distribution Information Disclosure Determination under Part 4 of the Commerce. Act 1986. The Commerce Commission: Dr M Berry. S Begg. P
-
3 Oct 2012 -
Calculation of risk-free rate and debt premiums for the September 2012 WACC determination. WACCs are estimated as at. 9/1/12. Calculation of the risk-free rate. Calculation of the debt premium. Raw data from Bloomberg on bid yield to maturity for