Showing 1,171
to 1,180
of 1,265 results
-
14 Jun 2018 -
DAIRY NOTIONAL PROCESSOR’S ASSET BETA – RESPONSE TO SUBMISSIONS NEW ZEALAND COMMERCE COMMISSION. 4 JUNE 2018. Prepared by:. Cambridge Economic Policy Associates Pty Ltd in association with. Freshagenda Pty Ltd. CONTENTS. 1. Introduction. 4. 2.
-
27 Mar 2018 -
3082703. ISSN 1178-2560. Project no. 16453. Public version. Powerco Limited Electricity Distribution Customised Price-Quality Path Determination 2018. [2018] NZCC 5. The Commission: Part 4 Division. Sue Begg. Dr Stephen Gale. Dr Mark Berry. Dr Jill
-
27 Mar 2018 -
3166578.5. ISBN no. 978-1-869456-33-7. Project no. 16463/14.17. Public version. Wellington Electricity’s customised price-quality path. Final Decision. Date of publication: 28 March 2018. 2. 3166578.5. Associated documents. Date Reference Title.
-
11 Jun 2018 -
IN THE DISTRICT COURT AT AUCKLAND. CRI-2016-004-012904 [2018] NZDC 1853. COMMERCE COMMISSION Prosecutor. v. APPENTURE MARKETING LIMITED Defendant. Hearing: 2 February 2018. K Muirhead for the Prosecutor No appearance by or for the Defendant.
-
7 Jun 2018 -
OTERANGA BAY TO HAYWARDS RECONDUCTORING Transpower New Zealand Limited 2007. All rights reserved. i. OTERANGA BAY TO HAYWARDS A LINE (CHURTON PARK SECTION) RECONDUCTORING. ATTACHMENT C: STAKEHOLDER CONSULTATION SUMMARY. Transpower New Zealand
-
7 Jun 2018 -
Attachment E: Board approval and. Chief Executive certification.
-
7 Jun 2018 -
TRANS POWER. Keeping the energy flowing. Waikoukou 22 Boulcott Street PO Box 1021 Wellington 6140 New Zealand. P 64 4 495 7000 F 64 4 495 6968. www.transpower.co.nz. Keston Ruxton Manager, EAD Regulation Development Regulation Branch Commerce
-
7 Jun 2018 -
OTERANGA BAY TO HAYWARDS RECONDUCTORING Transpower New Zealand Limited 2007. All rights reserved. i. CHURTON PARK SECTION OF OTERANGA BAY TO HAYWARDS A LINE RECONDUCTORING LISTED PROJECT APPLICATION. Transpower New Zealand Limited. May 2018.
-
7 Jun 2018 -
OTERANGA BAY TO HAYWARDS RECONDUCTORING Transpower New Zealand Limited 2007. All rights reserved. i. OTERANGA BAY TO HAYWARDS A LINE (CHURTON PARK SECTION) RECONDUCTORING. ATTACHMENT B: OPTIONS AND COSTING REPORT TRANSPOWER NEW ZEALAND LIMITED April
-
7 Jun 2018 -
OTERANGA BAY TO HAYWARDS RECONDUCTORING Transpower New Zealand Limited 2007. All rights reserved. i. OTERANGA BAY TO HAYWARDS A LINE (CHURTON PARK SECTION) RECONDUCTORING. ATTACHMENT D: OUTAGE MODELLING REPORT. Transpower New Zealand Limited.