Showing 19,471
to 19,480
of 19,604 results
-
10 Dec 2012 -
Draft Decision on Initial DPPs for. Gas Pipeline Businesses. 7 December 2012. 1 EXECUTIVE SUMMARY. 1. 2 INTRODUCTION. 2. 3 THE PROJECTIONS AND RESET MODEL. 2. 3.1 General comments. 2. 3.2 Tax depreciation. 3. 3.3 Capital Expenditure. 4. 3.3.1
-
10 Dec 2012 -
SUB-12-103. 3 December 2012. John McLaren. Chief Advisor. Regulation Branch. Commerce Commission. WELLINGTON. By email: regulation.branch@comcom.govt.nz. Dear John. Revised Draft Decision on the Initial Default Price-Quality Paths for Gas Pipeline
-
7 Dec 2012 -
Project no. 13.01/12078. Public version. Review of the designated backhaul services. Review of the Standard Terms Determination for the designated service Chorus’ unbundled copper local loop and unbundled copper low frequency network backhaul
-
26 Jul 2013 -
BARNZ Post Conference Section 56G Submission Page 1. BARNZ POST CONFERENCE SUBMISSION ON WELLINGTON AIRPORT. SECTION 56G REVIEW. 17 August 2012. 1. INTRODUCTORY REMARKS. The scope of the review. Section 56G requires the Commission to ‘report to
-
-
-
26 Jul 2013 -
Questions/issues arising from the Wellington Airport conference held on 7 August 2012. 1. Air NZ to provide examples of ‘excess’/’over-investment” in quality at Wellington. Airport. 2. Are there other quality measures that could be included
-
26 Jul 2013 -
NZ Airports Cross Submission – Process and Issues Paper Airport Services July 2012. CROSS-SUBMISSION ON THE COMMERCE COMMISSION'S PROCESS AND ISSUES. PAPER AIRPORT SERVICES - SECTION 56G REPORTS. 1. The New Zealand Airports Association ("NZ
-
26 Jul 2013 -
Report prepared for Wellington International Airport Ltd. Recent developments in airport regulation in Australia and the UK and implications for New Zealand. Stuart Shepherd, Vhari McWha and Joanna Smith. 20 July 2012. Recent developments in airport
-