Showing 281
to 290
of 313 results
-
10 Dec 2012 -
From Contact Energy. THE COMMERCE COMMISSION'S REVISED DRAFT DECISION ON THE INITIAL DEFAULT. PRICE-QUALITY PATHS FOR GAS PIPELINE SERVICES. Submission to Commerce Commission. This submission by Contact Energy Limited (Contact) comments on the
-
10 Dec 2012 -
Submission to the Commerce Commission on Revised Draft Decision on the Initial. Default Price-Quality Path for Gas. Pipeline Services. 6 December 2012. Page 2 of 34. CONTENTS. CONTENTS. 2. INTRODUCTION. 3. EXECUTIVE SUMMARY. 4. OPENING COMMENTS. 7.
-
10 Dec 2012 -
Default price-quality path reset for gas pipelines. November 2012. Draft, privileged and confidential. Project team:. Tom Hird Daniel Young. CEG Asia Pacific Suite 201, 111 Harrington Street Sydney NSW 2000 Australia T: 61 2 9881 5754 www.ceg-ap.com.
-
18 Dec 2012 -
2504214 v3. PO Box 73020 Auckland Airport Manukau 2150 New Zealand. AUCKLAND AIRPORT'S CROSS-SUBMISSION ON THE SECTION 56G REVIEW DRAFT WIAL REPORT 29 NOVEMBER 2012. INTRODUCTION. 1. In this cross submission, Auckland Airport responds to matters
-
10 Dec 2012 -
Page 1 of 12. 7 December 2012 Dr Mark Berry Chair Commerce Commission P O Box 2351 Wellington By email Dear Mark. Submission on the Revised Draft Decision on the Initial Default Price-Quality Paths for Gas Pipeline Services 1. Following the November
-
10 Dec 2012 -
7 December 2012 Mr. John McLaren. Chief Adviser Regulation Branch Commerce Commission PO Box 2351 Wellington 6140. Dear John, Please regard this letter as our submission to the Commerce Commission (“the Commission”). on the Reasons Paper for
-
10 Dec 2012 -
P 64 4 471 1155 F 64 4 471 1158. Level 14, St John House, 114 The Terrace, PO Box 10 444, Wellington 6143, New Zealand. www.haletwomey.co.nz. 7 December 2012. John McLaren. Chief Advisor. Regulation Branch. Commerce Commission. P O Box 2351.
-
10 Dec 2012 -
Draft Decision on Initial DPPs for. Gas Pipeline Businesses. 7 December 2012. 1 EXECUTIVE SUMMARY. 1. 2 INTRODUCTION. 2. 3 THE PROJECTIONS AND RESET MODEL. 2. 3.1 General comments. 2. 3.2 Tax depreciation. 3. 3.3 Capital Expenditure. 4. 3.3.1
-
10 Dec 2012 -
SUB-12-103. 3 December 2012. John McLaren. Chief Advisor. Regulation Branch. Commerce Commission. WELLINGTON. By email: regulation.branch@comcom.govt.nz. Dear John. Revised Draft Decision on the Initial Default Price-Quality Paths for Gas Pipeline
-
7 Dec 2012 -
Project no. 13.01/12078. Public version. Review of the designated backhaul services. Review of the Standard Terms Determination for the designated service Chorus’ unbundled copper local loop and unbundled copper low frequency network backhaul