Showing 701
to 707
of 707 results
-
1 Mar 2023 -
8.2 clause references are to clauses of the TPM. 7 The first edition of the BBC assumptions book is online here.
-
26 Jul 2023 -
Information on airport websites suggests that the consultation process has historically taken over a year.
-
1 Mar 2023 -
specifications. There are online-monitoring systems which enable us to monitor the condition of. ... We have online monitoring systems that monitor the condition of key assets in real time.
-
1 Mar 2023 -
30 For those companies for which the Bloomberg description was not sufficiently clear, we further investigated their relevance through desktop research, including an analysis of companies’ websites, annual reports, and/or ...…
-
1 Mar 2023 -
Review of the NZCC’s WACC-setting methodology. Prepared for Aurora, Orion, Powerco, Unison, Vector, Wellington Electricity. 10 November 2022—reviewed on 31 January 2023. Final. www.oxera.com. Oxera Consulting LLP is a limited liability
-
11 Apr 2023 -
TRANSPOWER NEW ZEALAND | NET ZERO GRID PATHWAYS 1 – MAJOR CAPEX PROJECT (STAGED) INVESTIGATION 1. Net Zero Grid Pathways 1. Major Capex Proposal (Staged). 2 December 2022. TRANSPOWER NEW ZEALAND | NET ZERO GRID PATHWAYS 1 – MAJOR CAPEX PROJECT
-
23 Feb 2023 -
fg. The IM review: Investing to enable decarbonisation. and realise the benefits of electrification. A report for the B6 |Final | 18 November 2022. 2. 2. The IM review: Investing to enable decarbonisation and realise the benefits of electrification.