Showing 21
to 30
of 227 results
-
3 Apr 2024 -
Instructions on how to apply for an examption are available on the Commission's website: ... We expect the statistical principles of sampling are maintained. Instructions on how to apply for an examption are available on the…
-
3 Apr 2024 -
$F$9 to $H$9 — from applicable LFC ID cost of capital determination (ComCom website). ... Mid-point estimate of vanilla WACC. $F$9 to $H$9 — from applicable LFC ID cost of capital determination (ComCom website).
-
13 Feb 2024 -
The databases are intended to include data publicly disclosed on the websites of the regulated providers.
-
3 Apr 2024 -
Mid-point estimate of vanilla WACC. $F$7 to $H$7 — from applicable LFC ID cost of capital determination (ComCom website). ... from SE9A Index column - CPI table (Statistics NZ Website). 4(iii): Calculation of…
-
8 Feb 2024 -
This list does not replace or summarise the determinations themselves. Suppliers and auditors should read the latest version of the determination published on our website.
-
21 Mar 2024 -
References to "ID Schedule 4" refer to Schedule 4 of the "EDB Information Disclosure Requirements Information Templates Schedules 1-10 TIDR 2024" (29 February 2024), available on our website at:
-
29 Feb 2024 -
EDB Information Disclosure Requirements. Information Templates. Schedules 11a–13. Excluding 11c. Company Name. Disclosure Date. AMP Planning Period Start Date (first day). Templates for Schedules 11a–13 excluding 11c. Prepared 16 February 2024.
-
29 Feb 2024 -
Further information about information disclosure requirements for local lines companies can be found on the Commission’s website.
-
23 Apr 2024 -
The Commission’s website includes a fact sheet to help people spot a pyramid scheme, as well as general information about scams.
-
18 Apr 2024 -
The Commission is seeking feedback from stakeholders, including Chorus, on the draft decision, which is available along with supporting information on the Commission’s website.